Home Products Find 304 Results
Supplier Nature

Payment method

304 About

ERW carbon welded steel tube

Product(s)

2 of 2

  • YOUFA BRAND BUILDING MATERIAL WELDED ERW CARBON STEEL PIPE
    • Min Order:1 ton

    • Industry:Minerals & Metallurgy

    • Length:: 5800/6000mm or as requirement

    • End protector:: Plain Or Threaded With Sockets Or Beveled With Pla

    • Special Pipe: Thick Wall Pipe

    • Delivery time:: Within 7-15 Days

    • Material:: ST37/ST52,STK400/STK500,Q235/Q345,S235JR

    • Application:: Structure Pipe

    • Region:Tianjin/Tianjin

    • Port:Tainjin port

    • Payment Method:T/T, L/C

  • carbon steel welded pipe
    • Unit Price:US $490-520 /ton

    • Min Order:5 ton

    • Industry:Minerals & Metallurgy

    • Technique: welded

    • tickness: 0.45-25mm

    • length: 1-12mm

    • Usage: building,threading,water,hating,factory,car,manufa

    • Outer Diameter: 10-1219mm

    • material: Q25-Q345, SS400, ASTM A53, A36, A500

    • Region:Tianjin/Jinghai

    • Port:Tianjin Port

    • Payment Method:T/T, L/C, D/P D/A, Credit Card, Westem Union, Cash

    Follow Supplier:

  • hot dip galvanized steel pipe/tube
    • Unit Price:US $800 /metric ton

    • Min Order:5 metric ton

    • Industry:Minerals & Metallurgy

    • diameter: 20-219mm

    • length: 1-5.8/6/11.8/12m or as you required

    • tolerence: +5% or -5%

    • zinc coating: 200-300g/m2

    • standard: ASTM A53 BS1387-85 GB/T3091-08 DIN2440 JIS-G3444

    • material: Q195 Q215 Q235 Q345

    • end treatment: plain end,beveled, threaded with sockets/coupling

    • Region:Tianjin/Tianjin

    • Port:TIANJIN XINGANG PORT, DALIAN PORT, QINGDAO, TANGSHAN

    • Payment Method:T/T, L/C, D/P D/A, MoneyGram, Credit Card, PayPal, Escrow

    Follow Supplier: