galvanized carbon steel tubes

  • group nameHot dipped galvanized steel pipe

  • Min Order25 metric ton

  • brand nameBossen steel

  • payment methodL/C, D/A, D/P, T/T, Western Union, MoneyGram

  • update timeTue, 08 Sep 2015 16:23:55 GMT

Paramtents

  • Standard BS, BS 1139, BS 1387, BS EN10025

  • Grade Q195-Q345, Q195, Q215, Q235, Q345

  • Thickness 0.5 - 12.7 mm

  • Section Shape Round

  • Outer Diameter 15 - 273 mm

  • Secondary Or Not Non-secondary

  • Application Structure Pipe

  • Technique ERW

  • Certification BSI

  • Surface Treatment Copper Coated

Packging & Delivery

  • Min Order25 metric ton

Briefing

Quick Details Standard:ASTM, BS, GB, JIS, ASTM A53-2007, BS 1387, GB/T3901, JIS G3444-2006Grade:A53-A369, Q195-Q345, A53

Detailed

 

Quick Details

 

  • Standard:ASTM, BS, GB, JIS, ASTM A53-2007, BS 1387, GB/T3901, JIS G3444-2006
  • Grade:A53-A369, Q195-Q345, A53(A,B), Q195, Q215, Q235, Q345
  • Thickness:0.5 - 24 mm
  • Section Shape:Round
  • Outer Diameter:21.3 - 600 mm
  • Place of Origin:Tianjin, China (Mainland)
  • Secondary Or Not:Non-secondary
  • Application:Structure Pipe
  • Technique:ERW
  • Certification:ISO ,CE
  • Surface Treatment:Galvanized
  • Alloy Or Not:Non-alloy

Packaging & Delivery

Packaging Details:31,61,91 pcs tubes in one bundle,3 galvanized straps on each end and 3 in the middle, altogther 9 straps.
Delivery Detail:within 20 days

 

Product Description

GALVANIZED STEEL PIPES

galvanized carbon steel tubes

Packaging & Shipping

galvanized carbon steel tubesgalvanized carbon steel tubesgalvanized carbon steel tubes

Company Information

galvanized carbon steel tubes

 

galvanized carbon steel tubes

 

Our Services

 

Why choose us

 

1. We are professional steel pipe/steel tube/steel coil/Hollow section/Scaffolding/Section Steel manufacturer.

2. Specialized in steel pipe/steel tube/steel coil/Hollow section/Scaffolding/Section Steel industry for more than 10 years.

3. We guarantee thatgood quality,prompt delivery,perfect service.

Our after-sales service start immediatelyafter signing the contract.

1. No matter FOB orCIF the price term is we would try our best to find a lowest freight cost for

customers' reference.

2. The third-partyinspection always gets real and true data from us and we will send production

photos to customers ifthere is no inspection.

3. Do our best to helpcustomer arrange the shipment and customs clearance.

4. Installation,maintenance and repair instructions with full information.

5. 3-8 years warrantydepends to different products.6.Accept Changing or Refunding if the products cannot be installed rightly.

If you are interested in steel pipe/steel tube/steel coil/Hollow section/Scaffolding/Section Steel,pls contact us feel free.

 

 

Tianjin Youyong Steel Pipe Co.,Ltd.

Add: No.7,Taipingcun Industrial Park,Daqiuzhuang Town,Jinghai County,Tianjin, China

 

Name:Landy Lu

 

Mail: bossensteel9..........com

 

Skype: bossensteel9

 

Tel:+86-18222142507