scaffold tubes

FOB Price
  • US $763.31

    10 - 40,000 metric ton

  • US $595.54

    40,001 - 999,999 metric ton

  • group namePost

  • Min Order10 metric ton

  • brand nameTYTSTEEL

  • payment methodT/T, L/C, D/P D/A, MoneyGram, Credit Card, Westem Union, Escrow

  • update timeTue, 22 Apr 2014 14:48:10 GMT

Paramtents

  • Standard BS, GB, DIN, ASTM

  • Standard BS 1387, BS 1139, BS 4568, BS EN 39, BS 31, GB/T 8163-1999, GB/T 8162-1999, GB/T 3091-2001, GB/T 13793-1992, DIN 2444, ASTM A53-2007

  • Grade 16Mn, A53-A369, ST35-ST52, Q195-Q345

  • Grade 16Mn, A53(A,B), St37, St52, St42, Q235, Q345, Q195, Q215

  • Thickness 1.2 - 15 mm

  • Section Shape Round

  • Outer Diameter 21 - 273 mm

  • Secondary Or Not Non-secondary

  • Application Fluid Pipe

  • Technique ERW

  • Certification BV,SGS,ISO9001-2008

  • Surface Treatment Galvanized

  • Special Pipe API Pipe

  • Alloy Or Not Non-alloy

  • Commodiy scaffold tubes

  • Shape Round

  • outside of Diameter 48.3mm:

  • Tolerance,thickness +not limited,-10%

  • Weight,Single Tube +10%,-8%

  • For quantities less than 150meter each +10%,-8%

  • over 150meter +/-4%

  • Application scaffolding

  • Grade YST-210,YST240

Packging & Delivery

  • Min Order10 metric ton

Briefing

Steel Scaffold Tubes, black,
48.3 mm O.D., mild steel,
continous weld and 40 mm. N. B.
'Medium' and 'Heavy'

Detailed

 

scaffold tubes

STEEL TUBE FOR STRUCTURE PURPOSE CONFIRMED: TO AS1163,BS1139 scaffold tubes

N.B. and Series

Outside diameter

Thickness

Nominal weight Black Tubes Plain End

Calculated Nominal weight Galvanised Tubes Plain End

 

mm

mm

kg/m

m/tonne

kg/m

m/tonne

15   L
       M
       H

21.3

2.00
2.65
3.25

0.96
1.22
1.45

1042
820
690

1.00
1.27
1.50

1000
787
667

20    L
       M
       H
 

26.9

2.35
2.65
3.25

1.42
1.58
1.90

704
633
526

1.47
1.64
1.96

680
610
510

25    L
       M
       H

33.7

2.65
3.25
4.05

2.04
2.46
2.99

490
407
259

2.09
2.52
3.94

478
397
254

32    L
       M
       H

42.4

2.65
3.25
4.05

2.61
3.15
3.86

383
317
259

2.69
3.24
3.94

372
309
254

40    L
       M
       H

48.3

2.90
3.25
4.05

3.27
3.61
4.43

306
277
226

3.37
3.73
4.55

297
268
220

50    L
       M
       H

60.3

2.90
3.25
3.65
4.50

4.14
4.57
5.10
6.17

242
219
196
126

4.26
4.71
5.25
8.09

235
212
190
124

65    L
       M
       H
 

76.1

3.25
3.65
4.50

5.84
6.53
7.92

171
153
126

5.99
6.70
8.09

167
149
124

80    L
       M
       H

88.9

3.25
4.05
4.85

6.86
8.48
10.10

146
118
99

7.04
8.70
10.32

142
115
97

90    L
       M
       H

101.6

3.65
4.05
4.85

8.82
9.75
11.60

113
103
86

9.09
10.03
11.87

110
100
84

100   L
        M
        H

114.3

3.65
4.50
5.40

9.97
12.10
14.50

100
83
69

10.18
12.39
14.69

98
81
68

110   L
        M
        H

127.0

4.50
4.85
5.40

13.6
14.6
16.2

74
68
62

13.9
14.90
16.5

72
67
61

125   L
        M
        H

139.7

4.50
4.85
5.40

14.9
16.2
17.9

67
62
56

15.24
16.56
18.16

66
60
65

135   L
        M
        H

152.4

4.50
4.85
5.40

16.4
17.7
19.5

61
57
51

16.77
18.07
19.87

60
55
50

150   L
        M
        H

165.1

4.50
4.85
5.40

17.8
19.2
21.2

56
52
47

18.20
19.63
21.62

55
51
46

150   L
        M
        H

168.3

4.50
4.85
5.40
6.30

18.1
19.6
21.7
25.3

55
51
46
40

18.50
20.00
22.10
25.7

54
50
45
39

175   L
        M
        H

193.7

4.85
5.40
5.90

22.60
25.00
27.30

44
40
37

23.13
25.53
27.83

43
39
36

200   L
        M
        H

219.1

4.85
5.60
5.90

25.7
29.4
31.0

39
34
32

26.24
29.94
31.54

38
33
32

250   H

273.0

5.90

38.8

26

39.56

25

300   H

323.9

6.3

49.5

20

50.40

20

350   H

355.6

8.00

68.6

14.50

69.58

14

 

If both parties  have good  cooperation relationship for 5years  in the filed of scaffold tubes or  galvanized steel  pipe, payment terms can   change  from L/C AT SIGHT , T/T TO L/C 45DAYS AFTER SIGHT

Nearest port for product export
TIANJIN XINGANG PORT, QINGDAO PORT, SHANGHAI PORT, NINGBO PORT
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, CIP, CPT, DDP, DDU
Acceptable payment methods
T/T, L/C, D/P D/A, MoneyGram, Credit Card, Westem Union, Escrow
Contact Suppliers

Follow this Suppliers