#35 stainless connecting master link for roller chain new connector

FOB Price
  • US $0.05

    1 - 10 piece

  • group name#35 roller chain

  • Min Order1 piece

  • brand nameTZBRT/make kart parts

  • model#35 chain connecting master links

  • payment methodL/C, D/A, D/P, T/T, Western Union, MoneyGram, Paypal

  • update timeMon, 20 Jun 2016 17:04:45 GMT

Paramtents

  • Name #35 chain connecting master links

  • Style Rivet

  • Inner palte depth 9mm

  • Roller diameter 5.08mm

  • Pitch 9.525mm

  • Plate thickness 1.3mm

  • Pin diameter 3.58mm

  • Width between inner plates 4.77mm

  • Pin length 12.4mm

  • Ultimate tensile strength 7.90/1795 kN/LB

Packging & Delivery

  • Size3cm x 3cm x 1cm

  • Weight0.01kg / piece

  • Min Order1 piece

Briefing

#35 stainless connecting master link for roller chain new connector

Detailed

#35 stainless connecting master link for roller chain new connector 

Product Description

Roller chain connecting links also known as master links are used to connect two ends of the roller chain together.
#35 chain has a 3/8" spacing between each link and is approximately 3/8" wide
#35 chain is commonly used on mopeds, mini-bikes, and large go-karts.

#35 connecting master link (9)#35 connecting master link (8)

Our company

IMG_6736IMG_6717IMG_6749

      TAIZHOU Bright Machinery Factory was founded in 1998. We are a branch of Bright Holding Group Limited and located in Binhai Industrial Area, Taizhou, Zhejiang Province. We have professional engineers and management team in the producing of the scooter and motorcycle parts for U.S.A, Russian, Europe, Brazil, and other countries. We have enough ability to satisfy different requirements from yours in this field. Who could bring a lot of international experience and professional and an unparalleled level of service for you.

Our Services

Packaging & Shipping

IMG_1082QQ20160229163938QQ20160205103233

FAQ

Q1. How to pay?

A: TT, PAYPAL, WEST UNION, DP, DA, Credit card up to you.

Q2. What is your term of delivery?

A: EXW, FOB, CFR, CIF, DDU.

Q3. How about your delivery time?

A: Generally, it will take 24-48 hours after receiving your advance payment. Some is one week. The specific delivery time depends on the items and the quantity of your order.

Q4. How to produce customized products?

A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q5. How to get a sample?

A: We can supply the sample if we have ready parts in stock.

Q6. Do you test all your goods before delivery?

A: Yes, we have 100% test before delivery.

Q7: How do you make our business long-term and good relationship?

A: 1. We keep good quality and competitive price to ensure our customers benefit ;

2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.

Nearest port for product export
Ningbo, Shanghai
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW, Express Delivery
Acceptable payment methods
T/T, L/C, Credit Card, PayPal, Westem Union, Cash, Escrow
Export mode
Export through agents
Contact Suppliers

Follow this Suppliers