Scaffold pipe

  • group nameScaffold Pipe

  • Min Order1 piece

  • brand nameTIANJIN SGB SALES AND SERVICE TRADE CO.,LTD

  • payment methodL/C

  • update timeFri, 29 Sep 2017 09:47:38 GMT

Packging & Delivery

  • Min Order1 piece

Briefing

Good Price ERW Galvanized Iron Scaffolding Pipe

Detailed

Overview
Quick Details
Standard:
BS, BS 1139
Grade:
Q195-Q345, Q195, Q235, Q345
Thickness:
2.75 - 3.25 mm
Section Shape:
Round
Outer Diameter:
42 - 48 mm
Place of Origin:
Guangdong, China (Mainland)
Secondary Or Not:
Non-secondary
Application:
Structure Pipe
Technique:
ERW, hot rolled and welded
Certification:
SGS
Surface Treatment:
Galvanized
Special Pipe:
Thick Wall Pipe
Alloy Or Not:
Non-alloy
Type:
scaffolding galvanized iron pipe
Material:
Q235 steel pipe
Pipe Length:
5800m
Pipe Diameter:
48mm
Pipe Thickness:
2.75/3/3.25mm
Lifespan:
more than 5 years
Color:
Silvery(galvanized), bare colour, or painted pipe available

Features 

1. Scaffolding galvanized iron pipe   are made of Q235  steel with high strength and durability.

2. Scaffolding galvanized iron pipe   can be jointed together at any angle with the right coupler. They are wonderful succedaneum of standard scaffoldings and steel props.

3. Scaffolding galvanized iron pipe   are widely used in construction and real estate which are much cheaper and convenient.

4. Scaffolding galvanized iron pipe   are multi-functional; they can be cut at any length as the customers’ requirement.

5. Scaffolding galvanized iron pipe   match with couplers are good choice for outside masonry construction and also proper for inside concrete support.

 

Product Description

 Specifications

Namescaffolding galvanized iron pipe
Place of OriginGuangzhou, China
BrandAJ

Size

(more customized size available)

Length(mm)Diameter(mm)Thickness(mm)
5800482.75/3/3.25
MaterialQ195/Q235/Q345 carbon steel
Surface treatmentSilvery(galvanized), bare colour, or painted 
ColorSilvery, black, or as required
Welding techniqueCO2 arc Welding
CertificationSGS;EN12810
MOQ(Minimum Order Quantity)1 pieces
PaymentT/T
Delivery time20days after deposit
PackageWithout outer packing or as you required
Nearest port for product export
XINGANG PORT, ANY PORT
Delivery clauses under the trade mode
FOB, CFR, CIF, EXW
Acceptable payment methods
T/T, L/C, D/P D/A
Contact Suppliers

Follow this Suppliers