High Turnover Frequency Concrete Slab Wall Formwork From China Aluminium Formwork

  • group nameFormwork scaffold

  • Min Order1 metric ton

  • brand nameDTLD

  • payment methodL/C, T/T

  • update timeThu, 11 Jul 2019 16:13:36 GMT

Paramtents

  • Color: Silver

  • Material: Aluminum 6061-T6

  • Max Loading: 60KN/ Square Meter

  • Standard formwork length: 2.7m, 2.34m, 1.2m

  • Carrying Capacity: 30-45KN/m2

Packging & Delivery

  • Min Order1 metric ton

Briefing

The specification of aluminium formwork system and advantage of aluminium formwork system.

Detailed

Quick Details

Place of Origin:     Tianjin, China (Mainland)
Brand Name:     Zhonghong
Model Number:     Formwork System H20 Beam
Cycle:     300Times
Material:     Aluminum 6061-T6
Test:     SGS
Max Loading:     60KN/ Square Meter
Service:     OEM service and sale-after service
Weight per square aluminized:     20-28kg (Standards formwork)
Carrying Capacity:     30-45KN/m2
standard formwork length:     2.7m, 2.34m, 1.2m
Aluminum thickness:     4mm

High Turnover Frequency Concrete Slab Wall Formwork From China Aluminium Formwork

Product Description

Specification of Aluminium Formwork System:

 

Material

 6061-T6 Aluminium alloy

 

 

Main Components

 Beam

 column

 wall

 Prop

 Others

 

Applications

 Exhibition setup

 Interior refurbishing

 All the towers can be connected together for multi-purpose

Safe working load

 60KN/m2

Size

 Non-standard: custom-made as per buy’s requirements

 

 

Features

 Easy to Handle

 One-time Pouring

 High Concrete Pouring Rate

 More Reuses

 Great Recyclable Value

 Environmental Friendly

High Turnover Frequency Concrete Slab Wall Formwork From China Aluminium Formwork

 High Turnover Frequency Concrete Slab Wall Formwork From China Aluminium Formwork

Our Advantage


 

1

 Easy to Handle

2

 Unsurpassed construction speed

3

 Good stability, high bearing capacity

4

 High Concrete Pouring Rate

5

 Great Recyclable Value

6

 No construction waste

7

 You provide drawings → We provide a plan for free → Discuss about the system's price

 

Comparision of Aluminium Formwork and Wood Formwork:

 

NO.

 Reference

 Aluminum Formwork

 Wood Formwork

1

 Material cost (Included Support)

 $183-216/m2

 $13--16/m2

2

 Turnaround times

 200times at least

 3-5times 

3

 Assembling and dismantling labor cost

 $3.6-4.2/m2

 $4.2-4.7/m2

4

 Recovery value

 $67/m2

 $0.8/m2

5

 Subtotal artificer materials 

 $4.4-4.9/m2

 $7.5-8/m2

6

 Leveling the wall plastering labor cost

 $0.4/m2

 $2/m2

7

 Leveling the wall plastering material cost 

 $0.3/m2

 $2.6/m2

8

 Ergonomics

 20m2/day

 15m2/day

9

 Final economic indicators

 $5.9-6.4/m2

 $12-13/m2