DIFFUL WBS Solar Surface Pump,24V 210W solar pump with mppt controller.

FOB Price
  • US $309.0

    1 - 20 piece

  • group nameSolar Pool & Surface Pumps

  • Min Order1 piece

  • brand nameDIFFUL

  • modelDQB2-25-24-210

  • payment methodPaypal

  • update timeTue, 14 Jul 2026 18:23:59 GMT

Paramtents

  • Brand DIFFUL、 WBS

  • Model DQB2-25-24-210

  • Included DC solar pump with mppt controller

  • main material Cast Iron Casing

  • Application Farmland irrigation, garden watering, livestock drinking, and off-grid home water supply.

  • Pump Warranty 2 years

  • Controller DC Auto-switching Controller

  • Motor Permanent Magnet Brushless Motor

  • VOC <60 V

  • Package type Wooden Case, Carton Packaging

Packging & Delivery

  • Size28cm x23cm x26cm

  • Weight27.443kg / piece

  • Min Order1 piece

Briefing

DIFFUL WBS Solar Surface Pump,24V 210W solar pump with mppt controller.

Detailed