DIFFUL WBS Solar powered swimming pool pump,72V 1200W solar pump with mppt controller.

FOB Price
  • US $919.0

    1 - 20 piece

  • group nameSolar Pool & Surface Pumps

  • Min Order1 piece

  • brand nameDIFFUL

  • modelDLP27-19-72-1200-AD

  • payment methodPaypal

  • update timeTue, 14 Jul 2026 00:53:04 GMT

Paramtents

  • Brand DIFFUL、WBS

  • Model DLP27-19-72-1200-AD

  • Included AD solar pump with mppt controller

  • main material Cast Iron Casing

  • Application swimming pool

  • Pump Warranty 2 years

  • Controller AD Auto-switching Controller

  • Motor Permanent magnet brushless motor

  • VOC <450v

  • Package type Wooden Case, Carton Packaging

Packging & Delivery

  • Size63cm x27cm x48cm

  • Weight40.017kg / piece

  • Min Order1 piece

Briefing

DIFFUL WBS Solar powered swimming pool pump,110V 1200W solar pump with mppt controller.

Detailed