DIFFUL WBS Solar Surface Pump,72V 1100W solar pump with mppt controller.

FOB Price
  • US $639.0

    1 - 20 piece

  • group nameSolar Pool & Surface Pumps

  • Min Order1 piece

  • brand nameDIFFUL

  • modelDCPM26-15-72-1100

  • payment methodPaypal

  • update timeWed, 15 Jul 2026 05:07:30 GMT

Paramtents

  • Brand DIFFUL、WBS

  • Model DCPM26-15-72-1100

  • Included DC solar pump with mppt controller

  • main material Stainless Steel 304

  • Application Irrigation, Poultry Farming, Ranch, Fountain,Bore

  • Pump Warranty 2 years

  • Controller DC Auto-switching Controller

  • Motor Permanent magnet brushless motor

  • VOC <170V

  • Package type Wooden Case, Carton Packaging

Packging & Delivery

  • Size48cm x27cm x40cm

  • Weight40.393kg / piece

  • Min Order1 piece

Briefing

DIFFUL WBS Solar Surface Pump,72V 1100W solar pump with mppt controller.

Detailed