Perforated baffle decorative ceiling decorative panel

FOB Price
  • US $30.00

    1 - 500 cubic meter

  • US $28.00

    501 - 5,000 cubic meter

  • US $26.00

    5,001 - 50,000 cubic meter

  • group nameHome decoration aluminum ceiling system ceiling designs board

  • Min Order1 cubic meter

  • brand nameMNW

  • modelMNW-070802

  • payment methodT/T

  • update timeWed, 08 Jul 2020 09:22:36 GMT

Paramtents

  • Material Aluminum Alloy

  • Application Mall

  • Thickness 0.5-1.2mm

  • Certificate ISO9001

  • Shape Circular

  • Size Customized Size

  • MOQ 50SQM

  • Package Wooden Box Resist Compression

  • Colour RAL COLOUR

Packging & Delivery

  • Size200cm x 200cm x 200cm

  • Weight20.00kg / cubic meter

  • Min Order1 cubic meter

Briefing

Aluminum perforated facade panel adopts 1100,3003,5005 aluminum alloy plate as base material.

Detailed

Product Description

Detailed Images
Aluminum perforated facade panel adopts 1100,3003,5005 aluminum alloy plate as base material. The surface coating is divided into fluorocarbon spraying, powder spraying, polyester paint spraying, fluorocarbon pre-roll coating. fluorocarbon sprayed surface coating according to the processing technology is divided into two coating one baking, three coating one baking and three coating two baking, powder sprayed surface coating for one coating one baking, the color can be provided by the company standard color card for customers to choose.
Conventional thickness:1.5mm,2.0mm,2.5mm,3.0mm.  Commonly used specifications:600*600mm,600*1200mm
Certificate
Packing&Shipping
FAQ
Q1: Which third-party certificate you have passed?  A: ISO9001, ROHS, BV, SGS and so on.  Q2: What size you can provide?  A: About thickness, we can provide from 0.2mm to 6mm.  Q3: How about the delivery time?  A: New production: Need about 15-35 days after receiving your down payment or LC Stock: After your down payment, we will deliver within about 10-20 days.  Q4: Sample Free?  A: Yes, but freight collected.  Q5: Payment term?  A: T/T,L/C,Yes,by T/T,30% deposite before production,70% balance before delivery.