Home Products Find 5 Results
Supplier Nature

Payment method

5 About

bs1387 pre galvanzied pipe

Product(s)

1 of 1

  • Bs 1387 Galvanized steel pipe
    • Unit Price:US $550-950 /metric ton

    • Min Order:10 metric ton

    • Industry:Minerals & Metallurgy

    • Standard: BS, GB, DIN, ASTM

    • Standard: BS 1387, BS 1139, BS 4568, BS EN 39, GB/T 3091-2001, DIN 2444, ASTM A53-2007

    • Grade: 16Mn, A53-A369, ST35-ST52, Q195-Q345

    • Grade: 16Mn, A53(A,B), St37, St52, St42, St45, Q235, Q345, Q195, Q215

    • Thickness: 1.2 - 8 mm

    • Section Shape: Round

    • Outer Diameter: 19 - 273.1 mm

    • Secondary Or Not: Non-secondary

    • Application: water/oil/gas pipe,conduit pipe,scaffolding pipe,greenhouse pipe,etc.

    • Technique: Hot Rolled

    • Certification: ISO9001-2000

    • Surface Treatment: Galvanized

    • Alloy Or Not: Non-alloy

    • Region:Tianjin/Tianjin

    • Port:TIANJIN XINGANG PORT, QINGDAO PORT, SHANGHAI PORT, NINGBO PORT

    • Payment Method:T/T, L/C, D/P D/A, MoneyGram, Credit Card, Westem Union, Escrow

    Follow Supplier:

  • hot-dipped and pre galvanized Steel Pipe
    • Min Order:20 piece

    • Industry:Minerals & Metallurgy

    • Technique: ERW

    • Grade: 10#-45#, A53-A369, Q195-Q345

    • Thickness: 0.5 - 10.5 mm

    • Outer Diameter: 0.5 - 8 inch

    • Application: fluid pipe and structure pipe

    • Secondary Or Not: Non-secondary

    • Region:Tianjin/Jinghai

    • Port:xingang port

    • Payment Method:T/T, L/C, D/P D/A, MoneyGram, Credit Card, PayPal, Westem Union, Cash, Escrow

    Follow Supplier:

  • FORWARD STEEL BS1387 water pipe 48.3mm scaffold galvanized steel tube
    • Min Order:5 ton

    • Industry:Construction & Real Estate

    • Product Name:: 3/4

    • Standard:: API, ASTM, BS, DIN, GB, JIS, API 5L

    • Outer Diameter:: 48.3/48.6mm

    • Application:: Structure Pipe

    • Technique:: erw

    • Surface Treatment:: As customer requirements

    • Alloy Or Not:: Non-alloy

    • Length:: 1-12 m or as request

    • Delivery Detail:: 15-30 working days after deposite delivery

    • Section Shape:: round shape

    • Region:Tianjing/Tianjing

    • Port:xingang port

    • Payment Method:T/T, L/C, D/P D/A, MoneyGram, Credit Card, PayPal, Westem Union, Cash

    Follow Supplier: