1 of 1
Min Order:1 piece
Industry:Mechanical Parts & Fabrication Services
The material: I-section steel
Processing method: Arc welding, plasma arc welding, resistance welding
Processing equipment: Arc welder, plasma arc welder, resistance welder
Surface treatment: Anticorrosive paint
Region:中国遼寧省/大連
Turnover:USD 5 - 7 million per year
Employee:Below 100
Trade:6~`10
Min Order:1 piece
Industry:Machinery
Place of Origin: Tianjin China (Mainland)
Material: Stainless steel, iron, copper, aluminum
Maximum diameter: 5-170(mm)
Maximum length: 300(mm)
Sampling period: 4-7 days
Processing cycle: 4-7 days
Material used in manufacturing: Stainless Steel、 Aluminium alloy、 Pure copper, Bronze, High strength steel, Pure aluminum, Alloy, etc.
Region:Tian Jin/Tian Jin
Port:Tian Jin, Shang Hai
Payment Method:T/T, L/C, D/P D/A, PayPal
Min Order:1 piece
Industry:Mechanical Parts & Fabrication Services
Place of Origin:: Dongguan, China (Mainland)
Minimum Order Quantity:: 1 Pcs
Price:: Negotiable
Packaging Details:: Inner package with PE film first, then out package with Plastic box, carton last,Base on customer's requiry.
Delivery Time:: Normally, simple parts, 5-7 days, complicated parts, 7-15 days. according to customer drawing, quantity and material,special case will be sooner
Payment Terms:: T/T 50% as deposit 50% before shipment
Supply Ability:: 1200-1500 units per month
Size:: Medium - Size , According To Your Drawing
Region:Guangdong/Dongguan
Port:Shenzhen, Guangzhou
Payment Method:T/T
网络文化经营许可证:浙ICP备14006100号-11 2007-2024 Tradevv.com. All rights reserved.