Home Products Find 4 Results
Supplier Nature

Payment method

4 About

sandwich structure

Product(s)

1 of 1

  • EPS sandwich panel steel structure warehouse
    • Min Order:500 square meter

    • Industry:Construction & Real Estate

    • Name: Indonesia steel structure warehouse workshop

    • Key word: Indonesia steel structure workshop with office

    • Design: 3D max,CAD for steel structure frame

    • Material: Q235,Q345B,SS400 steel structure

    • Foof: Galvanized color sheet or sandwich panel

    • Wall: Galvanized sheet for steel structure workshop

    • Place of project: Indonesia steel structure workshop and warehouse

    • Delivery time: 30 days after steel structure drawing confirmation

    • Package: Steel structure frame pallet for 40HQ container

    • Application: workshop,warehouse,office,commercial bulding,shop

    • Region:Shandong/Qingdao

    • Port:Qingdao, Shanghai, Guangdong

    • Payment Method:T/T, L/C, Westem Union

    Follow Supplier:

  • SK-345 outdoor cabinet, with air conditioner, IP55, with monitoring system,
    • Unit Price:US $1800 /piece

    • Min Order:1 piece

    • Industry:Telecommunications

    • Dimension: W700*D700*H2200mm

    • Internal space: 42U (19 inch rack)

    • Cooling system: 500W Air Conditioner

    • Material: Alloy aluminum plate (thickness 1.5-3.0mm)

    • Protect level: IP55

    • Surface treatment: Outdoor powder coating

    • Mount method: On the ground

    6YRSTianjin Yanxiang Electronic Science And Technology Co., Ltd.

    • Region:Tianjin City/Tianjin City

    • Port:Tianjin

    • Payment Method:T/T

    Follow Supplier:

  • Steel Structure Plan with Wall and Roof Sandwich Panel, Door and Window
    • Min Order:30 piece

    • Industry:Construction & Real Estate

    • Lifespan for main structure: 50 years

    • Certificate: ISO9001:2008

    • Service: design, manufacture and install

    • Standard: GB

    • Steel grade: Q235,Q345

    • Region:Fujian/Xiamen

    • Port:XIAMEN, SHANGHAI, TIANJIN, GUANGZHOU

    • Payment Method:T/T, L/C

    Follow Supplier: