Process Step | Number of Applications | Coating Amount (kg/㎡) | Drying Time (H) | Construction Tools | Remarks |
| Base Surface Treatment | Remove contaminants, dust, etc., from the base surface and allow it to dry before proceeding with construction. | ||||
Putty application | 2-3 | 2.0-3.0 | 48 | Putty knife, scraper, straightedge, etc. | Level the base surface. |
Primer application | Penetrating or sealing primer | 0.1-0.125 | 12 | Roller, wool brush, spray gun | Strengthening putty, Adhesive strength, Sealing function |
| Scribing and Jointing | According to design jointing, level, snap lines, position, and protect with masking tape. | ||||
| Texture particle paint application | 1-2 | 3.4-4.5 | 48 | Putty knife,Spray gun | Stone-like effect. |
| Clear coat application | 1 | 0.10-0.125 | 12 | Spray gun, Roller | Weather resistance protection. |