Concrete steel tunnel formwork

  • group nameFormwork scaffold

  • Min Order1 metric ton

  • brand nameDTLD

  • payment methodL/C, T/T

  • update timeFri, 03 Apr 2020 10:48:06 GMT

Paramtents

  • Color: Red,Sliver or as your required

  • Material: Q235 Steel Plate

  • Surface treatment: Painted

  • Length: 900mm-1800mm

  • Width: 100mm-600mm

Packging & Delivery

  • Min Order1 metric ton

Briefing

Concrete steel tunnel formwork with hooks or without hooks,,Construction wall steel formwork board trustworthy China supplier .

Detailed

Quick Details

Place of Origin:     Tianjin, China
Brand Name:     Zhonghong
Model Number:     Steel foemwork
Length:     900mm-1800mm
Application:     Concrete stucture
Plate thickness:     3mm
Width:     100mm-600mm
Height:     55mm
Connection method:     Screw or nut
Material:     Q235 Steel Plate
Surface treatment:     Painted
Process:     Weld

Steel Formwork
Type
Concrete column formwork
Place of origin
Made in Tianjin China
Material
Q235 carbon steel
Length
1800,1500,1200,900,750,600,450mm,or as specialized
Width
600,500,450,300,250,200,150mm,or as specialized
Thickness
3mm/4mm/5mm
Width of fins
50mm/55mm/63mm
Surface treatment
High protected painted,Power coated,
Galvanized or as required
Color
Red,Sliver or as your required
Welding technique
CO2 are welding